10 utility interconnection queue experts

Former planners and engineers at PG&E, TVA, PacifiCorp, Xcel Energy, MISO and PJM Interconnection are among these utility interconnection queues experts, and all ten now hold interconnection or transmission titles at companies such as Arevon, Savion, Silicon Ranch and Hanwha Renewables. That mix helps a developer weighing study results and network upgrade costs, or moving community solar and storage projects through several utilities' queues.

10 professionals10 companiesData retrieved September 28, 2026

Professionals to explore

  1. Akash Patel

    LinkedIn

    Experience: Senior Manager, Interconnection · PureSky Energy

    $203 per 30-minute call

    Akash Patel has been Senior Manager, Interconnection at PureSky Energy since 2023, after Supervisor, DER Interconnection at K&A Power (2020-2023), and describes end-to-end interconnection strategy and execution for DG, community solar, utility-scale solar and BESS projects across multiple U.S. ISOs and utility jurisdictions. Akash was a System Planning Co-op at Eversource Energy (2019), a fit for distributed generation interconnection questions.

    Is this you? Claim your profile and get paid for calls.

  2. Andrew Redding, P.E.

    LinkedIn

    Experience: Vice President of Interconnection and Transmission · Heelstone Renewable Energy, LLC

    $673 per 30-minute call

    Andrew Redding, P.E. is Vice President of Interconnection and Transmission at Heelstone Renewable Energy, LLC (since 2023), after Interconnection Manager there (2019-2023). Andrew was Renewable Program Manager (2018-2019) and Power Quality Engineer (2017-2019) at Nashville Electric Service, a fit for interconnection and transmission strategy questions.

    Is this you? Claim your profile and get paid for calls.

  3. Brindavani M.

    LinkedIn

    Experience: Vice President - Transmission and Interconnection · Arevon

    $673 per 30-minute call

    Brindavani M. has been Vice President - Transmission and Interconnection at Arevon since 2024, after Sr. Director, Transmission and Interconnection (2023-2024), Director of Interconnection (2021-2023) and Director, Grid Services (2019-2021) there. Brindavani was Senior Engineer at PJM Interconnection (2006-2019), useful for PJM queue questions from someone who worked inside PJM.

    Is this you? Claim your profile and get paid for calls.

  4. Connie Lunde

    LinkedIn

    Experience: Senior Manager of Transmission · Savion

    $235 per 30-minute call

    Connie Lunde manages generation interconnection processes of utility scaled solar and storage projects across various RTOs and utilities as Senior Manager of Transmission at Savion (since 2025), after Manager of Transmission there (2024-2025). Connie was Consultant Transmission Planning Engineer at American Transmission Company (2001-2021) and Senior Energy Consultant III at Sargent & Lundy (2021-2023), the pick for transmission planning questions in RTO studies.

    Is this you? Claim your profile and get paid for calls.

  5. Dr. Tanushree Agarwal

    LinkedIn

    Experience: Former Director of Interconnection · OCI Energy

    $336 per 30-minute call

    Dr. Tanushree Agarwal was Director of Interconnection at OCI Energy (2023-2024) and has been Senior Director Interconnection and Transmission at IOWN since 2024; Tanushree was also Transmission Planning Manager at The AES Corporation (2022). Tanushree describes interconnection studies, power plant modeling and tariff procedures and managing a project portfolio's interconnection requests, a fit for study and tariff questions.

    Is this you? Claim your profile and get paid for calls.

  6. Halle Boso

    LinkedIn

    Experience: Interconnection Project Manager · Silicon Ranch Corporation

    $135 per 30-minute call

    Halle Boso is Interconnection Project Manager at Silicon Ranch Corporation (since 2025), a role responsible for managing the interconnection process in target markets. Halle was Transmission Planning Engineer (2023-2025) and Power Quality Intern (2021-2023) at Tennessee Valley Authority, useful for questions on how a transmission planner reviews an interconnection request.

    Is this you? Claim your profile and get paid for calls.

  7. J. Tucker Ozburn

    LinkedIn

    Experience: Director of Interconnection · Sol Source Power

    $336 per 30-minute call

    J. Tucker Ozburn oversees interconnection strategy and execution for a portfolio of 100+ community solar and storage projects across multiple utilities in New York and Illinois as Director of Interconnection at Sol Source Power (since 2024), managing all interconnection applications. At Nexamp, Tucker was Manager, Grid Integration Engineering (2024), Senior Interconnection Engineer (2023-2024) and Interconnection Engineer (2021-2023), the fit for New York and Illinois community solar queue questions.

    Is this you? Claim your profile and get paid for calls.

  8. Larry Winslow

    LinkedIn

    Experience: Sr. Manager Transmission Interconnection · C&S Renewables

    $235 per 30-minute call

    At C&S Renewables, Larry Winslow has been Sr. Manager Transmission Interconnection since 2023, integrating utility-scale solar and energy storage projects and, in their own words, optimizing network upgrade costs. Larry was Manager Interconnections at Arevon Energy (2021-2022), Senior Transmission Planning Engineer at Xcel Energy (2017-2020), Planning Engineer III at NiSource (2014-2017) and Sr. Expansion Planning Engineer at Midcontinent Independent System Operator (MISO) (2009-2014), the pick for network upgrade cost questions.

    Is this you? Claim your profile and get paid for calls.

  9. Sarah Kodaimati

    LinkedIn

    Experience: Interconnection Manager · rPlus Energies

    $169 per 30-minute call

    Sarah Kodaimati manages all interconnection related activities for large-scale wind, solar, BESS and pumped storage hydro projects from early stage development to commercial operation as Interconnection Manager at rPlus Energies (since 2024). Sarah was Interconnection Manager (2013-2015) and Industrial Power Engineer (2015-2021) at Pacific Gas and Electric Company, useful for questions seen from both sides of an interconnection request.

    Is this you? Claim your profile and get paid for calls.

  10. Shilpa Toppo (P.E.)

    LinkedIn

    Experience: Sr Director of Interconnection and Transmission · Hanwha Renewables

    $471 per 30-minute call

    Shilpa Toppo (P.E.) holds Sr Director of Interconnection and Transmission at Hanwha Renewables (since 2026) and was Sr. Director Interconnection and Transmission at 174 Power Global (2021-2025). Shilpa cites FERC/NERC compliance, PJM, ERCOT and WECC planning requirements and power flow and dynamic interconnection studies, and was Senior Area Transmission Planner (2015-2019) and Area Transmission Planner (2011-2015) at PacifiCorp, a fit for multi-market study questions.

    Is this you? Claim your profile and get paid for calls.

Choose the right perspective

For PJM questions, Brindavani M. (PJM Interconnection, 2006-2019) and Shilpa Toppo (P.E.) are closest; Larry Winslow covers MISO and network upgrade costs, and Connie Lunde and Halle Boso transmission planning. J. Tucker Ozburn and Akash Patel suit community solar and distributed generation, and Sarah Kodaimati, Dr. Tanushree Agarwal and Andrew Redding, P.E. overall interconnection strategy.

Questions to take into the conversation

  1. 01How do you decide which queue positions to keep or withdraw once cluster study results and upgrade allocations come in?
  2. 02What drives surprises in network upgrade cost allocations, and how do you budget for them before the facilities study?
  3. 03How do community solar interconnection applications differ from one utility to the next, and what slows them down?

About this directory

This is a professional research starting point based on business profile data retrieved on . Titles and companies reflect that source snapshot; roles marked former had ended by then. Check the linked profiles for current details. Inclusion does not imply Instant Expert membership or availability.

Other perspectives in Renewable energy